Page 3
ILB-CP-HE-SD WITH TBTS TEST ACCESSORY
ILBCP_TBTS_SD.EPS
AC (NORMAL)
DRIVER
IOTA ILB-CP-HE-SD
EMERGENCY DRIVER
LED
LOAD
WHITE
WHITE
BLACK
BLK/WHT
COMMON
UNSWITCHED
24/7 POWER
BLK/ORG (120 TO 277V, 50/60HZ)
AC INPUT (120 TO 277V)
SWITCHED OR
UNSWITCHED
HOT
TBTS
TEST ACCESSORY
RED (+)
BLUE (-)
RED/WHT (+)
BLUE/WHT (-)
LED INPUT(+)
LED INPUT (-)
LED OUTPUT (+)
LED OUTPUT (-)
UNIT
CONNECTOR
WHT/RED
RED/BLK (+)
ATTENTION: DO NOT MATE UNIT CONNECTOR UNTIL
INSTALLATION IS COMPLETE AND AC POWER IS SUPPLIED.
TEST ACCESSORY LEADS-OBSERVE PROPER
POLARITY WIRING.
MATE UNIT CONNECTOR AFTER INSTALLATION IS
COMPLETE AND AC POWER IS SUPPLIED
Illustration 3: Typical Wiring Diagram
5. LABELS
Attach the appropriate labels adjacent to the
TBTS.
Annotate Replacement Label with identical manufacturer part
number(s). The Caution and the Replacement labels must be on the fixture in a readily visible location to anyone
attempting to service the fixture.
6. WIRING THE A.C. INPUT
A. The
ILB-CP20-HE-SD-A
and A.C.
driver
MUST
be on the same branch circuit.
B. The
ILB-CP20-HE-SD-A
requires an
unswitched
A.C. power source of 120 to 277 VAC, 50/60Hz; therefore
when used with switched fixtures, the ILB input must be wired ahead of the switch.
C. Refer to the wiring diagram for proper wiring. For wiring diagrams not shown, consult our customer service.
7. COMPLETING INSTALLATION
When the installation is complete, switch the A.C. power on and join the
ILB-CP20-HE-SD-A
unit connector
(remove the protective red boot, if present). NOTE: If the battery has been fully discharged, the TBTS indicator
may remain OFF for a few minutes until the battery has achieved sufficient charge for functional testing.
OPERATION
Normal Mode
– A.C. power is present. The A.C. driver operates the LED load as intended. The
ILB-CP20-HE-SD-A
is
in the standby charging mode. The
TBTS
will be
flashing green
providing a visual indication that the battery is being
charged, or
solid green
if the battery is fully charged.
Emergency Mode
– The A.C. power fails. The
ILB-CP20-HE-SD-A
senses the A.C. power failure and automatically
switches to the
Emergency Mode
. The designated LED arrays are illuminated, for a minimum of 90 minutes. When the
A.C. power is restored, the
ILB-CP20-HE-SD-A
switches the system back to the
Normal Mode
and resumes battery
charging. See page 1 of the Instruction Manual.
TESTING & MAINTENANCE
The
ILB-CP20-HE-SD-A
is designed to automatically conduct 30-second tests at regular intervals every 28 to 30 days,
and a 90 minute test anually. Automatic testing will
not
begin until at least 24 hours after the
ILB-CP20-HE-SD-A
unit
connector is joined.
Load Calibration -
48 hours after the unit connector is joined, the
ILB-CP20-HE-SD-A
will conduct a
Load Calibra-
tion
. Note: after the Load Calibration is complete, any changes to the LED load that will affect its nominal input voltage
will necessitate a new Load Calibration
(see table below for the sequence of button presses to conduct a manual Load
Calibration). Automatic Testing will proceed in the following schedule: