
Goodrive300-01A series VFD for air compressor
Commissioning instruction
-22-
Chapter 4 Commissioning instruction
4.1 Commissioning instruction for the dual-VFD air compressor
4.1.1 Wiring diagram of the dual-VFD air compressor system
Oil gas temperature PT100
485-
485+
M
W
V
U
T
S
R
M
W
V
485+
485-
RO1C
RO1A
COM
COM
S3
A01
GND
RO2C
RO2A
RO1C
T
S
PE
T
S
Fan VFD
Wir
e
less
d
a
ta
co
lle
ct
io
n
te
rm
in
al
HMI
F an fau lt
Analog
output
Start/stop signal
Cooling fan
PE
M ain m o to r
U
GD20
GND
AI2
S1
COM
C o oling fa n
+24V
GND
485-
485+
CGND/PE
+24V
GND
485-
485+
Auxiliary temperature PT100
PTA2
PTB2
Auxiliary pressure
Discharge pressure
Po w er- freq ue nc y
tr an sfor m er
S
R
0V
11 0 V
22 0 V
So le n o id c oi l
RO1A
P2+
P2-
P1+
P1-
PTA1
PTB1
Em erg en cy s to p
S1
S2
S4
S5
COM
GD300-01A
R
Master V FD
R
Figure 4-1 Wiring diagram of dual-VFD air compressor system
4.1.2 Commissioning steps for the dual-VFD air compressor
It is recommended to use TC070A touch screen for display and commissioning.
Note
:
If you use a controller from another manufacturer, contact INVT technical support.
All the parameters displayed in the interfaces and are subject to actual displayed content.
The commissioning steps are as follows:
1. Perform wiring according to Figure 4-1 and ensure that the VFD for air compressor and the housing
of the air compressor are grounded properly.
2. After power up, the following interface is displayed.
Summary of Contents for Goodrive300-01A Series
Page 1: ......
Page 175: ...6 6 0 0 1 0 0 5 5 3...