SECTION 10—CHECK VALVES
Perfecto
2
™
54
Part No 1154245
9. Reinstall compressor inlet HEPA filter. Refer to Replacing the Compressor Inlet HEPA
Filter on page 26.
10. Run units and check for leaks. Refer to Leak Test on page 82.
11. Reinstall cabinet. Refer to Removing Cabinet on page 23.
FIGURE 10.1
Replacing Check Valves
Tie-wrap
Check Valve
Product Tank
Location of Product Tank
Check Valve
Regulator Outlet Tubing
Flow Arrow
Upper ¼ Inlet Tubing
(Connect to barb on
sieve bed)
Regulator
Lower ¼ Inlet Tubing
(Connect to product
tank)