SECTION 13—CONTROL PANEL
Part No 1154245
61
Perfecto
2
™
11. Remove the On/Off switch. Refer to Replacing On/Off Switch on page 69
12. Remove the circuit breaker by twisting the locknut on the outside of the control panel.
13. Discard existing control panel.
14. Install new control panel by reversing STEPS 3-12.
15. Run unit and check for leaks at pressure sensor tubing on product tank cap. Refer to
Leak Test on page 82
16. Reinstall cabinet. Refer to Removing Cabinet on page 23.
FIGURE 13.1
Removing Control Panel
Circuit Breaker
(STEP 9)
Hour Meter
(STEP 9)
On/Off Switch
(STEP 9)
Mounting
Screws
Control Panel
DETAIL “A”
Tie
Wrap
Tie
Wrap
Control
Panel
DETAIL “B”
¼-inch
Tubing
(STEP 6)
¼-inch Tubing (STEP 7)
Mounting Screws
(STEP 5)
Control Panel
P.C. Board