![Intracom WiBAS Connect Commissioning Manual Download Page 17](http://html1.mh-extra.com/html/intracom/wibas-connect/wibas-connect_commissioning-manual_2081786017.webp)
WiBAS OSDR-Hub & Terminal Station / WiBAS-Connect Terminal Station
Start Up & Commissioning Manual - Edition 5.1
17
Required Tools
Tools
Description
Digital Voltmeter
.
For measuring:
•
Power injector input power.
•
The RSSI of radio unit during antennas
alignment.
Adjustable torque U-wrench (up to 19 mm
opening and supporting max tightening
torque 45 Nm) for applying final tightening
torque to all antennas mounting kit.
A set of spanners (ring and open jaw) for
pre-tightening the mounting kit during
alignment process:
Description
Size / Dimension
Qty
Parabolic
and sectoral
integrated
antennas
M10 (17 mm A/F)
2
M12 (19 mm A/F)
2
WiBAS-
Connect
parabolic low
profile and
panel
antennas
M8 (13 mm A/F)
2
Adjustable torque wrench tool (supporting
max tightening torque 25 Nm).
Hexagon male bit for adjustable torque
wrench tool (for tightening WiBAS-OSDR TS
mounting kit with panel antenna).
T10 TORX bit for adjustable torque wrench
tool (for tightening outdoor DC PonE cover).
Flat slotted screw driver (min 10 mm).
Compass and Binocular for antenna
alignment.