background image

(19PO)  AP619D ELECTRIC PUMP  ENGLISH  4.875” X 7.25”  04/30/2020

19PO

READ AND SAVE THESE INSTRUCTIONS

Page 3

3.  Switch ON the pump by pressing “I” on the switch located on top of pump. See Fig 

(3)

.

4.  Turn valve control dial fully clockwise until it stops. The airbed is now inflating. See Fig 

(4)

.

5. When the airbed is fully inflated

turn the valve control dial back (counterclockwise) to the 

  center position closing the inflation valve. Then turn off the pump by pressing “O” on the  

 switch. See Fig 

(5)

NOTE:

 Turning the valve control dial from the center/closed position will open the valve 

inside the pump and allow air to escape, even if pump is not running. Operate the valve 

control dial when inflating or deflating the airbed, or for firmness adjustment (see step #6).  
Never disconnect the power line cord from the electrical outlet while the pump is operating. 

Switch off the pump first before disconnecting the power line cord. 

INFlATION

1.  Open line cord compartment cover and remove line cord. Do not yank on the cord. 

 

See Fig 

(1)

.

2.  Plug in the AC line cord into an AC electrical outlet. See Fig 

(2)

.

6.  If the airbed feels too firm, release some air by simply turning the valve control dial 

  gradually in either direction to allow air to escape until desired firmness is achieved, then  

  turn the valve control dial back to the center/closed position. If the bed feels too soft,    

  repeat steps #3 to #6 as necessary.

FIg (3)

FIg (4)

Inflate 

Position

FIg (5)

Rotate Back to Close valve

FIg (2)

110 – 120 v

220 – 240 v

FIg (1)

Reviews: