352
A
S AVE THESE INSTRUCTIONS
(352IO) SPA ENGLISH 7.5” X 10.3” PANTONE 295U 09/18/2020
English
Page 12
SET UP (continued)
4.
Press the
button to turn on the control panel. Press
the
button to infl ate the spa tub wall for 8 to 10
minutes until it is fi rm to the touch but not hard
(see
drawings 5 & 6)
.
IMPORTANT:
Do not over infl ate or use high pressure
air compressor to infl ate.
5.
Press the
button again to turn it off .
6.
Replace the air valve cap back.
The cap is designed to be screwed on and off . Never
exert force as this could cause the complete internal
infl ation system of the valve to come loose. See “Spa
Tub Air Valve Fastening” for valve maintenance.
NOTE:
If there is a need to replace the spa tub air pressure
release valve core
(23)
due to wear and tear, use the
included wrench
(22)
to unscrew the core from the valve
base. Insert the replacement core and tighten with the
wrench. Make sure the core is securely tightened
(see
drawing 7)
.
Infl ate the Spa Cover Air Bladder
1.
Open the infl ation valve and insert the infl ation hose
(7)
into the valve; press
to infl ate until it is fi rm to the
touch but not hard
(see drawing 8)
.
2.
Disconnect the infl ation hose
(7)
from the air blower
infl ation outlet and the valve.
3.
Replace the control base infl ation latch back; close
and recess the infl ation valve.
NOTE:
If there is a need to add some air to the spa tub wall
or spa cover air bladder after they have been setup, refer to
above “Infl ate the Spa Tub Wall” and “Infl ate the Spa Cover Air Bladder” sections. The cover air bladder is
preinstalled inside the spa cover. If it needs to be reinstalled, place the uninfl ated air bladder inside the spa
cover lip before infl ating the bladder.
7
22
23
5
8
7
6
IMPORTANT:
To prevent damage to the air blower motor never
block the air blower outlet opening during infl ation.