Chapter 2: Installation
NS3550-8T-2S Industrial Managed Switch User Manual
21
Wall mount plate mounting
Note:
Follow all the wall mount plate installation steps as shown in the example.
To install the industrial managed switch on the wall:
1. Remove the DIN-rail from the industrial managed switch. Use the screwdriver to
loosen the screws to remove the DIN-rail.
2. Place the wall-mount plate on the rear panel of the industrial managed switch.
3. Use the screwdriver to screw the wall mount plate onto the industrial managed
switch.
4. Use the hook holes at the corners of the wall mount plate to hang the industrial
managed switch on the wall.
5. To remove the wall mount plate, reverse the steps above.
Cabling
10/100/1000BASE-T and 100BASE-FX/1000BASE-SX/LX
All 10/100/1000BASE-T ports come with auto-negotiation capability. They automatically
support 1000BASE-T, 100BASE-TX, and 10BASE-T networks. Users only need to plug
a working network device into one of the 10/100/1000BASE-T ports, and then turn on
the industrial managed switch. The port will automatically run in 10 Mbps, 20 Mbps, 100
Mbps, or 200 Mbps, and 1000 Mbps or 2000 Mbps after negotiating with the connected
device.
The industrial managed switch has eight SFP interfaces that support 100/1000 Mbps
dual speed mode (optional multi-mode/single-mode 100BASE-FX/1000BASE-SX/LX
SFP module)