![Interlogix FlexZone Series Product Manual Download Page 32](http://html1.mh-extra.com/html/interlogix/flexzone-series/flexzone-series_product-manual_2076896032.webp)
Chapter 2: Installation
26
FlexZone™ Product Guide
Figure 22: Cable at fence posts
At corners or heavy gauge posts
Install sensitivity loops at all fence corners and at any heavy gauge fence posts.
Figure 23: Sensitivity loops at corner and at heavy gauge posts
At software defined zone boundaries
Optionally, install zone demarcation loops at soft zone boundaries for increased
zone isolation. The extra cable helps ensure that valid targets are located
accurately in the correct zone. See Figure 23 above for zone demarcation loop
layout recommendations and Figure 24 below for suggested use.
secure the cable at both sides
sensor cable
fence post
the cable should be snug
against the fence post
(not stretched tightly)
of each fence post
sensor cable
chain-link fence
1 m
(3.3 ft.)
0.5 m
(20 in.)
0.5 m
(20 in.)
Summary of Contents for FlexZone Series
Page 1: ...FlexZone Product Guide P N 466 2877 REV C ISS 19MAR19...
Page 6: ......
Page 24: ......
Page 41: ...Chapter 2 Installation FlexZone Product Guide 35 Figure 40 Mounting the splice enclosure 15 cm...
Page 62: ......
Page 86: ......
Page 94: ......