5
2. Refer to the following figure. Connect the three RS-232 cables between the interface PEM, the
Altek digitizer controller, and the TDZ workstation base unit as described in this section.
RS-232 Cable
Altek Digitizer Controller
TDZ
Workstation
Base Unit
Power Cursor RS-232
Two-Handed Controller
with 25-pin Cable
Interface PEM
Tablet RS-232
RS-232 Cable
RS-232 Cable
COM 1
COM 2
HC Power
A to D Converter
To connect the cables:
1. Connect one end of an RS-232 cable to the port labeled RS-232 on the interface PEM. Connect
the other end of the cable to COM 2 port on the TDZ workstation base unit. Tighten the cable
screws.
2. Connect the 25-pin cable from the two-handed controller to the port labeled Hand Controller
(HC) on the interface PEM. Tighten the cable screws.
3. Connect one end of an RS-232 cable to the port labeled Tablet on the interface PEM. Tighten the
cable screws. The other end of this cable is attached in Step 5.
4. Slide the interface PEM into the PEM bracket mounted to the underside of the digitizer table.
Refer to the following figure.
PEM
Bracket
Interface PEM
Summary of Contents for ImageStation ZII and use
Page 1: ...ImageStation ZII Installation and Use February 1998 DHA023330...
Page 4: ......
Page 22: ...18...