Chapter 1 - Setting Up 3
Selecting the Installation Location
After you unpack the equipment, select the installation location for the
graphics tower and workstation base unit (the GLZ6 system). When
selecting an installation location, consider the following:
♦
Because of the Adapter cable length, place the graphics tower on the
right side of the workstation (facing the back).
♦
The total weight of the GLZ6 system is approximately 120 pounds. If
you do not place the GLZ6 system on the floor, make sure the surface on
which it will rest can support the weight.
♦
Make sure the GLZ6 system has at least three inches of space in front
and behind for proper air ventilation. Never block the openings at the
front or back of the GLZ6 system.
♦
Avoid placing the GLZ6 system in locations with high levels of dust or
smoke.
♦
For a dual-screen configuration, two monitor orientations are possible -
horizontal (monitors side by side) or vertical (one monitor above the
other). Typically, the primary monitor is the left when horizontal, or the
top when vertical.
CAUTION
The surface on which you place the two monitors must be able to
support the combined weight of the monitors. If installing in a vertical
position, the support equipment for the top monitor must be specifically
designed for the purpose of stacking monitors.
Summary of Contents for GLZ6
Page 1: ...April 1996 GLZ6 Setup and Maintenance Guide...
Page 4: ......
Page 10: ...x Preface...
Page 16: ...6 Chapter 1 Setting Up...
Page 34: ...24 Chapter 2 Maintaining the System...
Page 44: ......