
Troubleshooting
37
4.9.2.2
Inserting the Module
Install the module by sliding into the correct bay (1/1 at front or 3/1 at rear) ensuring the module has docked with
the connector and the retention clip has engaged with the chassis. (
Figure 4–5
)
Caution
TheESI/Ops panel module variants are not interchangeable, a front mountied module cannote be
installed in the rear mounting position and vice versa.
4.10 List of Spare Parts and Ancillary Items
The following replaceable parts are available for the SS-1200-FCAL subsystem:
• Chassis (including Backplane)
• 19 inch rack mounting rail kit
• AC Power Supply/Cooling Module
• ESI/Ops Panel module (Front facing or Rear facing)
• Drive Carrier Module
• Front dummy fascia plates
• I/O Module
• Blank plates (1x1, 1x2 or 1x3)
• External FC-AL Signal Cables:
• (Country specific) power cords
• Tri-furcated power cords
• Keys for ESI/Ops Panel and Drive Carrier modules.
• All documentation
Figure 4–5
Installing an ESI/OpsPanel Module (Rear Mounting)
Summary of Contents for Fibre Channel
Page 3: ...SS 1200 FCAL Rack Installation and User Guide Part No 19933 01 Issue 1 0 June 01 1998 ...
Page 22: ...SS 1200 FCAL User Guide 12 ...
Page 34: ...SS 1200 FCAL User Guide 24 ...
Page 48: ...SS 1200 FCAL User Guide 38 ...
Page 56: ...iv FCAL LRC I O Module ...
Page 66: ...FCAL LRC I O Module 8 ...
Page 69: ...SS 1200 FCAL Drive Carrier Module Installation Guide Part No 19935 01 Issue 1 0 June 01 1998 ...
Page 72: ...iv FC AL Drive Module ...
Page 82: ...FCAL Drive Module 8 ...