
SS-1200-FCAL User Guide
36
4.9.2
ESI/Ops Panel Module
4.9.2.1
Removing the Module
Important
This module is designed for Hot Plug replacement. In order to ensure that there is no loss of
system availability during replacement, the enclosure DEFAULT state with the ESI module
removed is Power On
.
1
Release the catch on the side of the ESI/Ops Panel module.
2
Grip the front panel surround or the key (turned to the Service position0 firmly and slide the unit out of the enclosure
bay.(
Figure 4–4
)
3
The subsystem must not be run for extended periods without the ESI/Ops Panel module being in place.
Figure 4–3
Fitting the Grounding Screw
Figure 4–4
Removing an ESI/OpsPanel Module (Front Mounting)
Summary of Contents for Fibre Channel
Page 3: ...SS 1200 FCAL Rack Installation and User Guide Part No 19933 01 Issue 1 0 June 01 1998 ...
Page 22: ...SS 1200 FCAL User Guide 12 ...
Page 34: ...SS 1200 FCAL User Guide 24 ...
Page 48: ...SS 1200 FCAL User Guide 38 ...
Page 56: ...iv FCAL LRC I O Module ...
Page 66: ...FCAL LRC I O Module 8 ...
Page 69: ...SS 1200 FCAL Drive Carrier Module Installation Guide Part No 19935 01 Issue 1 0 June 01 1998 ...
Page 72: ...iv FC AL Drive Module ...
Page 82: ...FCAL Drive Module 8 ...