![Intellinet 522205 User Manual Download Page 52](http://html1.mh-extra.com/html/intellinet/522205/522205_user-manual_2074437052.webp)
7-17
Test ATM OAM End-to-End Loop Back:
This test sends ATM OAM F5 End to End
loop back request cells to the CO. This test will pass if response cell is received. Since
some r service providers might not support this test, it could still work even if this test
fails. If this test return FAIL consistently and the ADSL modem seems not working,
make sure the VPI and VCI are configured correctly.
Test Ethernet Connect to ATM:
This test checks the ATM AAL5 module is loaded
correctly.
Test PPPoE Connection:
This test checks the PPPOE connection.
Test PPP Layer Connection:
This test checks the PPP authentication.
Test IP Connect to PPP:
This test checks a valid IP address assigned from the service
provider.
Ping Primary DNS:
This test checks the primary DNS can be reached through ping
request.
Query DNS for
www.conexant.com
:
This test checks the host name can be resolved to
IP address though domain name servers
Ping
www.conexant.com
:
This test checks the specified host can be reached through
ping request.
Summary of Contents for 522205
Page 1: ...User Guide Revision 2 0 ...
Page 32: ...6 21 ...
Page 34: ...6 23 ...
Page 35: ...6 24 ...