![Intel Omni-Path Director Class Switch Series Installation Manual Download Page 54](http://html1.mh-extra.com/html/intel/omni-path-director-class-switch-series/omni-path-director-class-switch-series_installation-manual_2073475054.webp)
Figure 37.
Secure the Baffles to Top of Shelf Rails
6. Secure the top of the baffles to the rack rail as displayed in the following figure:
•
6-Slot Chassis: use 2 mounting nuts, 1 per rail.
•
24-Slot Chassis: use the lower of the 2 openings, 1 mounting nut per rail.
Intel
®
Omni-Path Fabric—Installation
Intel
®
Omni-Path Fabric Switches Hardware
Installation Guide
June 2019
54
Doc. No.: H76456, Rev.: 10.0