Chapter: Risk reduction and safe use
50
M10-17417-EN
For more dangerous projectile debris (brittle composite specimens, for example):
•
Use an interlocked shield.
Operator Protection Overview
The majority of hazards for operating materials testing systems are associated with:
•
rapid movement of the crosshead causing crush injuries
•
rapid closing of pneumatic grips causing pinch injuries
Operator Protection in Bluehill
®
provides a mechanism that lets you limit crosshead jog
speed and reduce grip closing pressure while you are setting up a test.
The default conditions during test set up are:
Summary of Contents for 68TM-10
Page 1: ...Model 68TM 10 Dual Column Table Model Preinstallation Manual M10 17417 EN Revision B ...
Page 8: ...Preliminary Pages 8 M10 17417 EN ...
Page 11: ...11 Preliminary Pages Product Support www instron com Crane method 61 Index 63 ...
Page 12: ...Preliminary Pages 12 M10 17417 EN ...
Page 52: ...Chapter Risk reduction and safe use 52 M10 17417 EN ...
Page 65: ......
Page 66: ...www instron com ...