23
Product Support:
Chapter 2
Requirements
•
•
•
•
68TM-10 Power Requirements and Cords. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
•
Responsibilities
The responsibilities outlined in this document are general. Refer to your specific
purchase contract for full details of your responsibilities and those of Instron
®
.
Customer’s responsibilities
It is the customer’s responsibility to ensure that all required support services are
available, and that all necessary checks are made prior to installing the testing system.
These services and checks are described below.
Site preparation
Proper site preparation is imperative so that the testing system operates in accordance
with its specifications and provides accurate test results. The customer must ensure
that the site requirements are satisfied prior to scheduling the installation appointment
(refer to
Handling and transporting
Unless specifically arranged otherwise, it is the customer’s responsibility to arrange the
off-loading, unpacking and moving of the testing system to the final site location (refer to
).
Summary of Contents for 68TM-10
Page 1: ...Model 68TM 10 Dual Column Table Model Preinstallation Manual M10 17417 EN Revision B ...
Page 8: ...Preliminary Pages 8 M10 17417 EN ...
Page 11: ...11 Preliminary Pages Product Support www instron com Crane method 61 Index 63 ...
Page 12: ...Preliminary Pages 12 M10 17417 EN ...
Page 52: ...Chapter Risk reduction and safe use 52 M10 17417 EN ...
Page 65: ......
Page 66: ...www instron com ...