1.0 - INTRODUCTION
Your new Instanta Boiler is designed to give years of trouble-free service provided that the instructions
contained in this manual are followed.
All new Instanta products are energy efficient, simple to operate and easy to service.
2.0 - WARNINGS & PRECAUTIONS
Please read the following carefully before starting work on this equipment
A competent installation engineer should install this appliance in accordance with the installation instructions for this
appliance and all relevant local and national standards including the following:
• Health & Safety at Works Act
• IEE Regulations
• Local and National Building Regulations
• BS Codes of Practice
• Water Supply Regulations
Your new water boiler is designed to provide a constant source of near boiling water for the preparation of hot
drinks. THIS IS VERY HOT
All personnel must be provided with sufficient and appropriate training in the safe use of this appliance.
In line with Health and Safety requirements we recommend that a risk assessment be carried out after the boiler has been
installed.
The push-button on the dispense-font illuminates RED. This should be sufficient in warning users that the font dispenses
hot water. However, if deemed necessary, a warning notice displayed next to the water font would be helpful in notifying
users that the appliance contains and dispenses near boiling water.
During normal use of the boiler, all surfaces remain cool. However, care should be taken to avoid potential injury from burns
and scalding whilst dispensing water from the font.
Scale formation within the hot water appliances can be problematic in hard water areas. Damage to the appliance caused
by excessive scale build up may invalidate the warranty. See notes on de-scaling.
ENVIRONMENTAL - Information on Disposal for Users of Waste Electrical & Electronic Equipment.
The “crossed out wheelie bin” symbol on this product means that discarded electrical and electronic products should not
be mixed with general waste. Disposing of the product correctly will help to save valuable resources and prevent any
potential negative effects on human health and the environment which could otherwise arise from inappropriate waste
handling. For proper treatment, recovery and recycling of end-of-life products, please contact your dealer or supplier for
further information, or local authority for details of your nearest designated collection point.
3.0 - CHECK LIST
Before starting installation check that you have the following parts:
1. Under-counter Boiler
2. Counter-top Water Font (c/w rubber water tube, electrical plug and earth lead)
3. Drip-tray Drain Kit
4. Paper Template (hole positions for fixing water font to counter-top)
5. 2 Metre Long Water Hose (WRAS approved - 3/4”bsp)
6. Plastic Hose Clip (to secure Water Tube)
7. 1 Sachet of De-scaler
8. Red Link Wire (for optional 30Amp electrical configuration) c/w instruction sheet
4.0 - INSTALLATION