11
Installation instructions & user guide
T210042 InstaTap office manual v1.01 June 2022
SECTION 6 Installing the under counter appliances
B office
6.3 General in cupboard arrangement - Boiling only models
• Install the tap as close to the boiler as possible,
use the illustration below as a guide, and follow
the steps through this section of the manual.
12
11
9
2
5
10
13
3
Mains water supply
1
Isolation valve (install rail inc.
non return valve)
2
Water block
3
4
UCB Mains electricity supply
5
Font waste pipe
6
Waste to drain
7
UCB Control cable
UCB mains water connection
9
Water filter
7
6
4
8
10
UCB Boiling water tube
11
UCB overflow & vent tube
12
1
13
Under counter boiler (UCB)
8
Filter head
6.2 Pipes and tubes
!
Install pipes & tubes correctly. No kinks, sags, pinches or loops.
Ensure there is a constant fall from the tap down to the appliance.