9
Step 4
1. Assemble the left and right Swing tube (24 L/R) to the Long axle (61) on the Handlebar post
(46) with Allen bolts (10), Spring washers (11), Flat washers (62), D-Shape washers (9), and
Waved washers (35).
Please don’t tighten the above bolts until this assembly step is complete.
2. Attach both Pedal tube joints (39 L/R) to the Cranks (56 L/R) with Allen bolts (10), Spring
washers (11), D-Shape washers (9), Flat washers (62) and Waved washers (35).
Please don’t
tighten the above bolts until this assembly step is complete.
3. Connect the left and right Swing tube (24 L/R) & Pedal support (15 L/R) with Hex bolts (18),
Flat washers (5 & 60) and Nylon nuts (6). Secure the above bolts (10), Hex bolts (18) and
Nylon nuts (6) tightly.
4. Fit the left and right Handlebar (28 L/R) to the corresponding Swing tubes (24 L/R) with
Carriage bolts (36), Arc washers (20) and Nylon nuts (13).