3.4 Quick System Commissioning
The parameters of GCB units have been set to the optimum before delivery, which
enables the GCB to meet the requirements of most applications. Generally, you only
need to set the working modes as required.
The system commissioning method is described based on the working modes.
The following figure shows the procedure for quick system commissioning.
Start
Connect the cables of the GCB, each
elevator system, and floor selectors.
Set the group control mode and ID of
each elevator.
Set the physical floor address of each
floor selector.
Confirm that the floor selectors can
call for elevators normally.
Enable other functions.
End