
Operation
SV 125
4016589
5--104
Version 1.0
Aeration:
Duration of Aeration [ms]
The venting time is entered
(To prevent syringes from sticking to the vacuum chamber after vacuum filling,
venting with nitrogen is performed after the vacuum filling).
Aeration stop [ms]
Aeration ends after the entered time.
Delay aeration on [ms]
Delay with which aeration is switched on.
Delay aeration off [ms]
Delay with which aeration is switched off.
Leaktest limit difference [mbar]
The limit value that the pressure is allowed to drop during leak test is entered.
Min. vacuum tank filling [mbar]
Entry of the required minimum pressure that must be reached in the vacuum tank,
before the vacuum valve opens.
Actual vacuum tank filling [mbar]
Display of the current pressure in the vacuum tank.
Summary of Contents for SV 125
Page 16: ...Contents SV 125 4016589 XIV ...
Page 20: ...Notes SV 125 4016589 Version 1 0 Page 4 ...
Page 50: ...Description of the machine SV 125 4016589 3 2 Version 1 0 3 2 Workplace ...
Page 60: ...Description of the machine SV 125 4016589 3 12 Version 1 0 ...
Page 86: ...Structure and function SV 125 4016589 4 26 Version 1 0 ...
Page 298: ...Operation SV 125 4016589 5 212 Version 1 0 ...
Page 334: ...Format change SV 125 4016589 Version 1 0 7 24 ...
Page 360: ...Troubleshooting SV 125 4016589 8 26 Version 1 0 ...
Page 388: ...Cleaning and maintenance SV 125 4016589 9 28 Version 1 0 ...
Page 390: ...Appendix SV 125 4016589 10 2 Version 1 0 ...
Page 392: ...Personnel training SV 125 4016589 Version 1 0 ...