WARNING: If, frequency inventor is being used in the equipment, TYPE B RCD
(residual current relay) with AC/DC sensitivity must be used before the equipment
power inlet (from the mains block terminals).
Please read these instructions carefully
before using the appliance, and retain them
for future use.
WARNING: This device must be
installed in accordance with the
current legislation and should only be used
in a well-ventilated area. Refer to the
instructions manual before installing and
using this device.
WARNING: Make sure that all paper
protection and packaging have been
removed before using the device. This
device should only be installed in closed
position.
WARNING: Do not clean the device
with direct or high-pressure water to
avoid damaging the electrical components.
WARNING: The device must be used
by trained personnel.
WARNING: There might be a risk of
fire when the device is operational if the
water inside the pool is hot.
WARNING: Do not leave your hand on
the closing surface of the lid while the
lid is closed. Your hand may get stuck.
WARNING: If the oven is operated for
a long time empty, the cabin sheets will
deform and homogenous cooking can not be
achieved.
1. INSTALLATION
Rip off the protective nylon. If any sticky material
remains on, clean it with a suitable solvent. (e.g.
Henkel - Helios)
Settle the appliance under a chimney hood as to
outlet the smoke, smell and the steam that come
out during the cooking.
If the smokes will forcedly be thrown out the
electrical connection of the aspirator should be
common with the appliance. If there is no
ventilation the appliance should be stopped. At
the same time the absorption quantity should not
be more or less than the gas come out from the
appliance.
Settle the appliance on a smooth and hard ground
with the help of its adjustable bases.
There should be a space of 60cm. at the left side
of the appliance as to easily make the assembling
and maintenance. This will also make easy the air
absorption of the motor. There should also be a
space of 10cm. at the back side for the air
circulation.
While setting the appliance, pay attention that the
door of the appliance should be opened minimum
110
0
for an easy load and discharge.
2. WATER CONNECTION
Make a water installation of 3/4" to the place
where the machine is and connect a spherical
valve.
The machine should be fed by 2-4 bar water at 7
0
Fh. So, the jet of water will be prevented to be
limed in a short time.
3. ELECTRICAL CONNECTION
Connect the machine to a network proper to the
electric installation standards DIN VDE 0100.
220-230V 1N AC 50Hz network voltage.
Use cable of quality H07 RN-F and of crosscut
3x2,5mm
2
Voltage tolerance should not be more than
10%. The machine must be earthed as DIN VDE
0100 clause 540.
4. GAS CONNECTION
Before making the connection consult the gas
supplier.
Install a fast closing stopcock in an easily
accessible position upline from the appliance.
Confirm the absence of leaks at the points of
connection.
Summary of Contents for FKG022E
Page 2: ...FKG022E FKG042E G E S Y G E S Y E G S Y E G S Y...
Page 4: ...KONTROL PANELLER CONTROL PANELS FKG022E FKG042E...
Page 5: ......
Page 17: ...17 RU RCD 1 60 10 1100 2 3 4 3 4...
Page 20: ...20 1900 C 374F 20 2300 C 446F 10 20 20 40 530 750 FKG022E 5 FKG042E 10 8 7 8...
Page 21: ...21 9 On Off 3 COOL 70 C 158 F 100 C 212 F 10 11 4 6 12 13 Reset 15...