![Innovative NV9 Operation Manual Download Page 25](http://html.mh-extra.com/html/innovative/nv9/nv9_operation-manual_2063757025.webp)
Copyright Innovative Technology Ltd 2008 GA326-6
9.2 NOTE PATH DEBRIS CLEARING / BELT CHANGING
the NV9
and lozenge
Debris Clearing
Examine the note paths, lozenge and no
Carefully clear an
e with a soft lint free
cloth that has been
and mild detergent solution (i.e. household
washing up liquid.). Take particular care ar
ses (see figure 12),
ensuring they are clean
d cash box spring plate are
not jammed.
Belt Changing
With the NV9 lozeng
carefully unplug the bottom connector of the
Remove and place the lozen
d remove the belts, sliding them
off the smallest wheels first. Replace the belt
g the reverse procedure from the above.
NOTE: With the Locking Cash Box, the Locking screw must be removed first.
To access the note path and lozenge, slide the red release catch on the end of
Validator and lift to open. Push the lozenge release catch and lift; the note path
are now exposed for maintenance (see figure 13).
Figure 12
- NV9 Note Path and Lozenge Access
te stacker for any dirt or debris.
d wipe the surfaces of the note paths and lozeng
dampened with a water
ound all the sensor len
and dry. Check that the note stacker an
e exposed (see figure 13)
‘’top to bottom cable assembly’’ from the lozenge.
ge on a clean dry surface an
s usin
NV9 Operations Manual 25
Lozenge
Release Catch
N
elease
ote
Path
Red R
Catch
Top to Bottom
Cable Assembly
Belts
Note S
u
tacker
sher Plate
P
Cash Box Spring
Plate
Lozenge
Locking Cash Box
Screw
Summary of Contents for NV9
Page 29: ...Copyright Innovative Technology Ltd 2008 GA326 6 ...
Page 30: ...Copyright Innovative Technology Ltd 2008 GA326 6 ...
Page 31: ...Copyright Innovative Technology Ltd 2008 GA326 6 ...
Page 32: ...Copyright Innovative Technology Ltd 2008 GA326 6 ...
Page 33: ...Copyright Innovative Technology Ltd 2008 GA326 6 ...