24
5). Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
6). Set the 3-way valve to the closed position immediately
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way and 3-way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
2. Air purging by the refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the closed position.
2). Connect the charge set and a charging cylinder to the service port of the 3-way valve
Leave the valve on the charging cylinder closed.
3). Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45’ for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut on the 2-way valve.
4). Check the gas leakage
Check the flare connections for gas leakage.
5). Discharge the refrigerant.
Summary of Contents for EV10C2DB6
Page 11: ...9 Model R mm L mm H mm Dimension of installation hole mm EV24C2DB6 163 293 45 65 H L R ...
Page 15: ...13 5 Wiring Diagram 5 1 Indoor Units EV10C2DB6 EV13C2DB6 EV18C2DB6 ...
Page 16: ...14 EV24C2DB6 ...
Page 17: ...15 5 2 Outdoor Units H10C2MR63 H13C2MR63 H18C2MR63 ...
Page 18: ...16 H24C2MR63 ...
Page 41: ...39 9 2 Diagnosis and Solution 9 2 1 Indoor fan speed out of control diagnosis and solution ...
Page 43: ...41 9 2 5 Indoor outdoor unit s communication error diagnosis and solution ...
Page 44: ...42 9 2 6 Refrigerant leakage detection diagnosis and solution 0 1 ...