
19P03-DOC01E REV-3
52
6. Hold the hexagonal shoulder bolt (G) with a 9/16” combination wrench and use a
1/2” combination wrench to remove the nut (H).
7. Remove the four (4) plastic rivets (E) from the cover (F) with a Trim clip removal
tool.
8. Remove the socket head shoulder bolt (A) with a 1/4” Allen socket and the 3/8”
drive ratchet.
9. Slowly remove the load cell with the bed caster support until the load cell
connectors are available and then unplug it. The load cell with the bed caster
support should be free from the base frame now.
10. Remove the set screw (C) with a #4 Allen wrench and remove the load cell from
the bed caster support.
11.
Reverse the above steps to install the new load cell.
Notice:
When installing the new load cell, be careful to not squeeze the wire
between
the load cell and
the frame of the bed.
Before tightening the screw (A) completely, remove the axle stands and put
the bed on the ground in order to remove the gaps created by the assembly
without load.
12. Verify that the new load cell is working properly before putting the bed back in
service.