
18
EAP-QUAD-11 / Version 181008 / www.innotech.at
EN
15
COPY TEMPLATE
ACCEPTANCE REPORT
FASTENER & PHOTO DOCUMENTATION
PRODUCT:
Item
Year of construction/Serial number:
(Type designation EAP/anchorage point)
Installation substructure:
(
e.g. solid concrete, concrete quality:
C20/25, wood rafter dimension, for sheet metal roofs:
roof manufacturer, profile, material,
sheet metal thickness, etc.)
Date:
Location:
Dowel type:
BEF/Sticker?/
Designation
Setting
depth:
[mm]
Drill bit Ø:
[mm]
Tightening
torque:
Photos:
(storage
location)
mm
mm
Nm
mm
mm
Nm
The undersigned installation company guarantees proper workmanship (edge spacing, inspection of the substructure, proper
cleaning of boreholes, compliance with curing times and processing temperature, compliance with the dowel manufacturer's
guidelines, etc.)
The client accepts the work performed by the contractor. The instruction manual, documentation of the anchorage points/photo
documentation and test logs have been transferred to the client (building owner) and have been made available to the user.
Near the system access to the fall protection system, the positions of the anchorages must be documented by the building owner
with plans (e.g. top view of the roof).
The expert fitter familiar with the fall protection system confirms that the installation tasks have been executed prop
-
erly, in accordance with the state of the technology, and in accordance with the manufacturer's instruction manual.
The technical safety reliability is confirmed by the installation company.
Handover of:
(e.g: Personal protective equipment PPE, fall arrest devices HSG, storage cabinet, etc.)
Item
Item
Item
Item
Integrated in the existing lightning protection system?
YES NO
Comments:
Name:
ACCEPTANCE REPORT NR.
____
(PART 2/2)
E A P - Q U A D R A T - 1 1
Client
Date, company stamp, signature
Date, company stamp, signature
Inspection: Contractor (expert who is familiar
with the fall protection system)