
22 | INSTRUCTION MANUAL INNO
PAD
INNO
5 PREPARING FOR INSTALLATION
5.1 CHOOSING THE INSTALLATION SITE
The following factors must be considered when choosing the installation site so as to ensure
that the INNO
PAD
can be easily installed and the iPad™* operated without problems:
A sufficiently strong WiFi signal must be available in the area for the iPad™*
to operate correctly.
At the installation site, it must be possible to go 56 mm into a solid wall or 45 mm into a
cavity
wall.
Tip:
Use the specially designed INNO
PAD
flush-mounting box for solid wall
installations. This item is not included in the scope of delivery but can be ordered
separately (product number: INN PAD-UP-99-99-02-00).
The installation site should not be exposed to direct sunlight and maintain temperatures
between 0 °C and 35 °C and a relative humidity between 10 % and 95 % (no condensation).
A sufficient power supply (according to specifications) has to be available at the
installation
site.
When installing the device in a solid wall, the area should be free of cables, supply
pipes and supporting struts.
Please note:
All electrical connections and installations must be carried out by a qualified
electrician in compliance with the general rules and regulations for electrical connections.
*Trademark notice: iPad™ is a trademark of Apple Inc., registered in the U.S. and other countries.
5.2 UNPACKING THE COMPONENTS
The compact INNO
PAD
packaging protects the individual components against damage and soiling.
To optimally protect the high-quality parts with easily damaged surfaces, the outer packaging is
designed so that the individual parts can be unpacked from their protective compartments one
by one in the order of assembly.
Please remember to remove the transport lock (marked by the sticker on the metal base plate)
before removing the components.
To avoid any damage, please handle each part with care and use the protective gloves during
installation that are provided for this purpose.