![INIM Electronics SmartLink Advanced Installation And Programming Manual Download Page 29](http://html.mh-extra.com/html/inim-electronics/smartlink-advanced/smartlink-advanced_installation-and-programming-manual_2061501029.webp)
SmartLink project development and programming
29
Installation and programming manual
A solution can be created or changed even without being connected
to the apparatus. For example, you can plan the layout of an
installation or set the options/parameters at your office and
download the settings to the system at a later time.
In this case, you must programme:
•
the Installer PIN, by selecting “SmartLink System” from the tree
menu on the left. The PIN must be entered in the “Programming
- Installer code” section on the right.
•
the Connection type via “Settings – Application data”. For the
connection specifications refer to
paragraph 4-7 PC Connection
.
DATA TRANSFER
The SmartLeague software programme provides buttons (in the tool
bar on the topp-left corner) for the transfer of the ongoing project/
programming data:
•
for download operations
•
for upload operations
These buttons will upload/download all the system data (including
any ongoing programming). Whereas, if you are working on a
message programming section, these buttons will upload/download
only the data on the open template.
6-3
Programming via the
software
The SmartLink can be programmed exclusively through the
SmartLeague software programme.
1.
Go to the “Recent solutions” section and either create a new
solution or open an existing one, or import the programming
data of a real system by clicking on the
button to upload
the data.
Table 12:
SmartLeague - solutions
A
The freshly opened
template remains in
the forefront whilst the
other open template
and the Homepage
remain in the
background.
B
Installation tree
structure.
C
Section in question.
D
Programming template
of the component to be
programmed (selected
from the tree
structure).
E
Monitoring board for
real-time monitoring of
the entire system.
C
A
D
B
E