First power up
25
Installation and programming manual
Chapter 5
FIRST POWER UP
In order to allow the system to perform an accurate auto-enrolling
operation on "First power-up", work carefully through the following
steps.
ATTENTION!
When wiring the system, be careful not to allow any form of power
(mains 230V or battery) to reach the SmartLink or its peripherals.
1.
Mount the SmartLink to the wall.
2.
Connect the antenna.
3.
Complete the wiring and balancing of the system detectors.
4.
Connect the outputs to the terminals.
5.
Connect the telephone line.
6.
Connect the primary power source (230V a.c.).
7.
Connect the backup battery.
Start the initializing phase.
8.
Start the Easyscan function.
9.
Remove all power from the system.
10. Insert the SIM card.
11. Restore power to the system.
5-1
Initializing phase
On powerup, the device carries out a self-diagnosis phase. During
this phase all the LEDs will flash.
If no anomalies are detected during the self-diagnosis phase, the
device will initialize the normal operating phase after approximately
30 seconds.
Initialization of the normal operating phase is signalled by the
deactivation of all the LEDs except the green LED which will be On
solid. If, however, anomalies are detected the LEDs will continue
flashing.
5-2
Easyscan procedure
During the installation phase of the SmartLink and thus first
powerup, the manufacturer strongly advises the use of the
“Easyscan” function before selecting the GSM network provider.
This function can be activated exclusively through the SmartLeague
software programme, therefore, you must refer to the respective
manual for the descriptions of the parameters involved.