![Ingersoll-Rand Odyssey TTA061G A Series Installation, Operation And Maintenance Manual Download Page 23](http://html1.mh-extra.com/html/ingersoll-rand/odyssey-tta061g-a-series/odyssey-tta061g-a-series_installation-operation-and-maintenance-manual_2059234023.webp)
SS-SVX10H-EN
23
and work toward the indoor unit. See
recommended tube sizes, .
N
No
otte
e:: Use long radius ells for all 90° bends.
All brazing should be done using a 2 to 3 psig dry
nitrogen purge flowing through the pipe being
brazed, see
N
NO
OT
TIIC
CE
E
S
Sy
ys
stte
em
m C
Co
om
mp
po
on
ne
en
ntt D
Da
am
ma
ag
ge
e!!
IIn
ns
stta
allll a
a rre
eg
gu
ulla
attiin
ng
g v
va
allv
ve
e b
be
ettw
we
ee
en
n tth
he
e n
niittrro
og
ge
en
n
s
so
ou
urrcce
e a
an
nd
d tth
he
e g
ga
au
ug
ge
e m
ma
an
niiffo
olld
d.. U
Un
nrre
eg
gu
ulla
atte
ed
d
p
prre
esss
su
urre
e cca
an
n d
da
am
ma
ag
ge
e ssy
ysstte
em
m c
co
om
mp
po
on
ne
en
nttss..
N
NO
OT
TIIC
CE
E
S
Sy
ys
stte
em
m C
Co
om
mp
po
on
ne
en
ntt D
Da
am
ma
ag
ge
e!!
W
We
ett--w
wrra
ap
p a
allll v
va
allv
ve
ess a
an
nd
d p
prro
otte
ecctt p
pa
aiin
ntte
ed
d s
su
urrffa
acce
es
s
ffrro
om
m e
ex
xcce
esss
siiv
ve
e h
he
ea
att.. H
He
ea
att cca
an
n d
da
am
ma
ag
ge
e s
sy
ysstte
em
m
c
co
om
mp
po
on
ne
en
nttss a
an
nd
d tth
he
e u
un
niitt ffiin
niissh
h..
5. Shut off nitrogen supply. Shut off the manifold
valve for the line that is connected to the suction
line service valve. Disconnect the line from the
gauge port on the valve.
Refrigerant Piping Procedures
(Indoor Unit)
Once liquid and suction lines are complete to the
refrigerant connections on the indoor unit, remove the
gauge port core(s) on the indoor unit connection stubs
to release the dry nitrogen charge.
N
NO
OT
TIIC
CE
E
U
Un
niitt D
Da
am
ma
ag
ge
e!!
D
Do
o n
no
ott a
ap
pp
plly
y h
he
ea
att tto
o rre
em
mo
ov
ve
e sse
ea
all c
ca
ap
pss u
un
nttiill tth
he
e
g
ga
au
ug
ge
e p
po
orrtt cco
orre
es
s h
ha
av
ve
e b
be
ee
en
n rre
em
mo
ov
ve
ed
d.. IIff sse
ea
all c
ca
ap
ps
s
a
arre
e iin
ntta
acctt,, a
ap
pp
plliicca
attiio
on
n o
off h
he
ea
att m
ma
ay
y g
ge
en
ne
erra
atte
e
e
ex
xcce
essssiiv
ve
e p
prre
essssu
urre
e iin
n tth
he
e u
un
niitt a
an
nd
d rre
essu
ulltt iin
n
d
da
am
ma
ag
ge
e tto
o tth
he
e cco
oiill o
orr e
ex
xp
pa
an
nssiio
on
n v
va
allv
ve
e..
1.
Remove both seal caps from the indoor unit
connection stubs.
N
NO
OT
TIIC
CE
E
U
Un
niitt D
Da
am
ma
ag
ge
e!!
D
Do
o n
no
ott rre
em
mo
ov
ve
e tth
he
e sse
ea
all cca
ap
ps
s ffrro
om
m rre
effrriig
ge
erra
an
ntt
c
co
on
nn
ne
eccttiio
on
ns
s,, o
orr o
op
pe
en
n tth
he
e sse
errv
viicce
e v
va
allv
ve
ess u
un
nttiill
p
prre
ep
pa
arre
ed
d tto
o b
brra
azze
e rre
effrriig
ge
erra
an
ntt lliin
ne
ess tto
o tth
he
e
c
co
on
nn
ne
eccttiio
on
ns
s.. D
Du
ue
e tto
o tth
he
e h
hiig
gh
h h
hy
yg
grro
osscco
op
piicc
p
prro
op
pe
errttiie
ess o
off tth
he
e R
R--4
41
10
0A
A o
oiill,, e
ex
xc
ce
essssiiv
ve
e e
ex
xp
po
ossu
urre
e tto
o
a
attm
mo
ossp
ph
he
erre
e w
wiillll a
allllo
ow
w m
mo
oiissttu
urre
e tto
o cco
on
ntta
am
miin
na
atte
e
tth
he
e s
sy
ysstte
em
m,, d
da
am
ma
ag
giin
ng
g tth
he
e cco
om
mp
prre
esssso
orr..
2. Turn on nitrogen supply. Nitrogen enters through
the liquid line gauge port.
3. Braze the liquid line connections.
4. Open the gauge port on the suction line and then
braze the suction line to the connection stub.
Nitrogen will bleed out the open gauge port on the
suction line.
5. Shut off nitrogen supply.
Leak Check
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
d o
off E
Ex
xp
pllo
os
siio
on
n!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w tth
he
esse
e iin
nssttrru
uccttiio
on
nss cco
ou
ulld
d rre
essu
ulltt iin
n
d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y o
orr e
eq
qu
uiip
pm
me
en
ntt o
orr p
prro
op
pe
errtty
y--
o
on
nlly
y d
da
am
ma
ag
ge
e..
U
Usse
e o
on
nlly
y d
drry
y n
niittrro
og
ge
en
n w
wiitth
h a
a p
prre
essssu
urre
e rre
eg
gu
ulla
atto
orr ffo
orr
p
prre
essssu
urriizziin
ng
g u
un
niitt.. D
Do
o n
no
ott u
usse
e a
ac
ce
etty
ylle
en
ne
e,, o
ox
xy
yg
ge
en
n o
orr
cco
om
mp
prre
es
ssse
ed
d a
aiirr o
orr m
miix
xttu
urre
ess cco
on
ntta
aiin
niin
ng
g tth
he
em
m ffo
orr
p
prre
essssu
urre
e tte
essttiin
ng
g.. D
Do
o n
no
ott u
usse
e m
miix
xttu
urre
ess o
off a
a
h
hy
yd
drro
og
ge
en
n cco
on
ntta
aiin
niin
ng
g rre
effrriig
ge
erra
an
ntt a
an
nd
d a
aiirr a
ab
bo
ov
ve
e
a
attm
mo
os
sp
ph
he
erriic
c p
prre
essssu
urre
e ffo
orr p
prre
essssu
urre
e tte
essttiin
ng
g a
ass tth
he
ey
y
m
ma
ay
y b
be
ecco
om
me
e fflla
am
mm
ma
ab
blle
e a
an
nd
d cco
ou
ulld
d rre
essu
ulltt iin
n a
an
n
e
ex
xp
pllo
ossiio
on
n.. R
Re
effrriig
ge
erra
an
ntt,, w
wh
he
en
n u
usse
ed
d a
ass a
a ttrra
acce
e g
ga
as
s
ssh
ho
ou
ulld
d o
on
nlly
y b
be
e m
miix
xe
ed
d w
wiitth
h d
drry
y n
niittrro
og
ge
en
n ffo
orr
p
prre
essssu
urriizziin
ng
g u
un
niittss..
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
d o
off E
Ex
xp
pllo
os
siio
on
n!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w rre
ec
co
om
mm
me
en
nd
de
ed
d s
sa
affe
e lle
ea
ak
k tte
esstt
p
prro
occe
ed
du
urre
ess cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr s
se
erriio
ou
us
s iin
njju
urry
y
o
orr e
eq
qu
uiip
pm
me
en
ntt o
orr p
prro
op
pe
errtty
y--o
on
nlly
y--d
da
am
ma
ag
ge
e..
N
Ne
ev
ve
err u
usse
e a
an
n o
op
pe
en
n fflla
am
me
e tto
o d
de
ette
ecctt g
ga
ass lle
ea
akkss.. U
Usse
e a
a
lle
ea
akk tte
es
stt sso
ollu
uttiio
on
n ffo
orr lle
ea
akk tte
es
sttiin
ng
g..
After the brazing operation of refrigerant lines to both
the outdoor and indoor unit is completed, the field
brazed connections must be checked for leaks.
Pressurize the system through the service valve with
dry nitrogen to 200 psi. Use soap bubbles or other leak-
checking methods to ensure that all field joints are leak
free. If not, release pressure, repair and repeat leak test.
System Evacuation
1.
After completion of leak check, evacuate the
system.
2. Attach appropriate hoses from manifold gauge to
gas and liquid line pressure taps.
N
No
otte
e:: Unnecessary switching of hoses can be
avoided and complete evacuation of all lines
leading to sealed system can be
accomplished with manifold center hose and
connecting branch hose to a cylinder of R-
410A and vacuum pump.
3. Attach center hose of manifold gauges to vacuum
pump.