
Safety
Lightsource LT6K
10
23201387 (03/05)
Operation and Maintenance Manual
Before Towing
Make sure wheels, tires and tow bar connectors are in
safe operating condition and tow bar is properly
connected before towing.
Store the rear jack and secure the handle by wrapping
the jack positioning pin chain around the handle to keep
it from being damaged during towing.
Figure 1
Towing
Do not tow this unit with a vehicle whose towing
capacity is less than the unit gross weight shown in
General Data.
Do not exceed maximum speed of 80km/h (or local
legal maximum, if lower) when towing unit.
Welding
Prior to any welding, disconnect alternator relays,
voltage regulator, meters, circuit breakers and battery
cables. Open all circuit breakers, and remove any
external connections. Connect the welding ground as
close as possible to the area being welded.
Winch Operation
Before and during all winch operation, ensure that the
area is clear of persons and obstructions over a 2m
radius. When the mast has completed its normal travel,
or is prevented from travelling, immediately release the
control switch, to ensure that no cable overtension
occurs.
Check that no person is behind the machine (within
10m) while the tower is raised or lowered.
The unit must have all outriggers extended and be level
before raising mast.
Figure 2
Summary of Contents for LT6K
Page 3: ...22545495 03 05 3 Lightsource LT6K Operation and Maintenance Manual...
Page 13: ...Safety Lightsource LT6K 12 23201387 03 05 Operation and Maintenance Manual...
Page 19: ...Operating Instructions Lightsource LT6K 18 23201387 03 05 Operation and Maintenance Manua...
Page 29: ...Maintenance Lightsource LT6K 28 23201387 03 05 Operation and Maintenance Manual...