
10
Albinpump.com
Albin Pump ALP Instruction Manual
since 1928
10 - Clean the inside of the pump casing, rotor and make sure that all the traces of the pumped liquid is gone. Dry the
surfaces with a clean cloth.
CAUTION!
A Respect all the rules necessary for the manipulation of the pumped product.
6 .2 .2 - HOSE / TUBE REPLACEMENT FOR ALP09N TO ALP25N
1 -
Check that the new hose / tube is clean and is the correct size
.
2 - Slide the clamp #14 over the end of the hose.
3 - Install the insert #8 into the hose / tube until the insert is
flush with the end surface of the hose (and cannot be inserted
any farther).
4 - Bend the hose / tube into shape and insert it into the casing
from the front.
5 - Position the inserts into the supports #13.
6 - Install the bolts to secure the clamp into place as shown
in the image.
7 - Repeat process for other end of hose.
8 - Apply a thin layer of ALBIN PUMP silicone grease on the
contact side of the hose that is in contact with the rollers.
9 - Repeat procedure for the other.
10 - Put the front bracket #3 and the front cover #2 in place. and reconnect the electrical power.
11 - Turn the rotor 180°.
12 - Adjust the roller pressure following the procedure described in chapter § 6.3 “Roller adjustment”.
NOTE : Some ALP series have 1 clamp per insert, whereas other ALP series have 2 clamps per insert. The number of clamps is
dependent on the series.
ALP
Maintenance
Summary of Contents for ALBIN PUMP ALP
Page 1: ...ALBIN PUMP ALP Peristaltic Pump Instruction Manual since 1928...
Page 34: ......
Page 35: ......