![Ingersoll-Rand 4TVC0009B100ND Installation, Operation And Maintenance Manual Download Page 16](http://html.mh-extra.com/html/ingersoll-rand/4tvc0009b100nd/4tvc0009b100nd_installation-operation-and-maintenance-manual_2060248016.webp)
16
VRF-SVX26D-EN
Installation
Installing the Drain System
1.
Push the supplied drain hose as far as possible over the drain hose port.
•
Do not apply excessive force to the piping on the unit side when connecting the drain hose.
•
Drain hose port locations differ depending on the unit type.
2. Wrap the insulation (supplied) around the drain hose and clamp the connection as tightly as
possible until you can see at least 8 holes.
Insulation
Clamp
3. Install the drain pipe into the drain hose. Secure it with PVC adhesive and clamps as necessary
to ensure a tight fit with no leakage.
Drain hose
PVC pipe
4. Install air vent to ensure smooth condensate drainage.
Air vent
Ceiling
Drain hose port
Drain hose