EonStor U16U Installation and Hardware Reference Manual
2-6
Unpacking the Subsystem
Step 8.
Cable connection
– Use the power cables that came with the subsystem to
connect to the subsystem to the mains. Use separately purchased SCSI cables
to connect the host ports to the host computers. (See
Chapter 4
)
Step 9.
Power Up
– Once all the components have been properly installed and all the
cables properly connected, the subsystem can be powered up and the RAID
array configured. (See
Chapter 4
)
2.5. Unpacking the Subsystem
The ES U16U subsystem will be packed in two separate levels as shown in
Figure 2- 1
below. Carefully check the items contained in each box before proceeding with
installation.
NOTE:
A detailed packing list can be found in the
Appendix D
of this manual.
Figure 2- 1:
Side View of the Packing Case
Upper Level:-
The boxes on the upper level contain:
♦
16 drive trays
♦
controller modules
♦
battery modules (
Optional item for single controller subsystems
)
♦
accessories
Lower Level:-
The lower box should contain the enclosure chassis with all the pre-
installed components. The pre-installed components should include:
♦
PSU modules
♦
LCD panel
♦
Cooling FAN modules
Enclosure
Accessories
Drive Trays x 16
Controller Modules