4.2. Installation Procedures
The installation must comply with national installation regulations.
Connection terminals are in the rear side of the UPS. Please take out the terminal cover to make
the connections.
Standard UPS circuit breakers and terminal settlements are shown below;
Terminals and Circuit Breakers for 5-6-8-10kVA 1Phase In/1Phase Out UPS
The equipment may only be installed and commissioned by authorized Technical Personnel.
When the UPS is brought from a cold place to a warmer place, humidity of the air may
condensate in it. In this case, wait for 2 (two) hours before beginning with the installation.
Summary of Contents for DSP FLEXIPOWER SERIES
Page 15: ...10 Pass the cables through the glands...
Page 36: ...31...