CT-MSEC ASSEMBLY INSTRUCTIONS
MAIN STRUCTURE ASSEMBLY (continued)
B1.
Assemble the Exercise Arm Frame Assembly to the assembly made in Step A2
using 2 – 3/8” x 4 ¾” bolts, 4 – curved washers and 2 – 3/8” nuts. Do not fully tighten
the bolts at this time.
B2.
Assemble the Support Assembly to the lower tube of the Exercise Arm Frame
Assembly and to the Main Upright using 4 – 3/8” x 4 ¾” bolts, 8 – curved washers,
and 4 – 3/8” nuts. Do not fully tighten the bolts at this time.
B3.
Assemble the Support Assembly to the pivot flange of the Exercise Arm Assembly
using 2 – 3/8” x 2 ½” bolts, 2 – 3/8” flat washers, and 2 – 3/8” nuts.
B4.
Attach the Forward Seat Support to the Seat Frame using 2- 3/8” x ¾” bolts with
blue patch and 2 – 3/8” flat washers, and to the Exercise Arm Assembly using 1 –
3/8” x ½” bolt with blue patch and 1 – 3/8” washer.
FULLY TIGHTEN ALL BOLTS AT THIS TIME
B5.
Attach the Handle Assembly to the Seat Frame using 2 - 3/8” x 4 ¾” bolts, 4 – 3/8”
washers and 2 – 3/8” nuts. Tighten these bolts.
6
1- Placard
Only install if not installing shrouds
Remove protective film after installation
20 - Weight Labels
1.
5.
F2
Cable Adjustment
15
1. Make sure bolt was installed in
second weight plate (STEP D5).*
2. Raise the exercise arm to the
highest leg curl position.
3. Use the cam washer first to
remove slack from the cable.
4. Use the threaded fitting on the top
weight if needed to remove more slack.
5. Cable adjustment should be tight
enough to raise the pulley arm to the stop
without raising the top weight.
6. Check that the weight pin
pins in each weight plate.
2.
3.
4.
Maximum 1" from
under bolt head to
bottom of jam nut
*First weight plate if installing a heavy stack
F1
F2
15