CT-MSEC ASSEMBLY INSTRUCTIONS
WEIGHT STACK AND CABLE ASSEMBLY
E1.
Attach a ball end of the MSEC Lower Cable to the “U”-Bracket. Place a 4 ½” pulley
onto the MSEC Upper Cable below the Triangular Bracket and fasten using the “U”-
Bracket, 1
– 3/8” x 2” bolt, 2 – 3/8” flat washers, and 1 – 3/8” nut.
E2.
Route the cable down between the plates welded to the base of the Loop Upright.
Install a 4 ½” pulley over the cable and attach to the plates using 1 – 3/8” x 2” bolt, 2
– 3/8” flat washers, and 1 – 3/8” nut.
E3.
Route the cable around a 4 ½” pulley and place the pulley into the pulley bracket
welded on the base of the Exercise Arm Assembly. Fasten the pulley using 1
– 3/8”
x 2” bolt with blue patch and 1 – 3/8” flat washer.
E4.
Route the cable und
er a 4 ½”pulley and place in the pulley bracket welded at the
base of the Support Assembly. Attach the pulley using 1
– 3/8” x 1 ¾” bolt, 2 – 3/8”
flat washers, and 1
– 3/8” nut.
E5.
Route the cable up to and through the pulley bracket welded at the top of the
Support Assembly. Place a 4 ½” pulley under the cable inside the pulley bracket
and fasten using 1
– 3/8” x 1 ¾” bolt, 1 – 3/8” flat washers, 1 3/8” small washer (on
weld side) and 1
– 3/8” nut.
E6.
Route the cable under a 4 ½” pulley and place inside the pulley arm of the Exercise
Arm Frame and fasten using 1
– 3/8” x 2 ¼” bolt, 2 – 3/8” flat washers, and 1 – 3/8”
nut.
E7.
Route the cable up to and inside the cam. Insert the ball end into the hook welded
inside the cam.
12