13
Ground installation method
•
In the case of the cable gland, it is screwed into the NPT ¾
hole of the device. At this time, do not tighten hard to enter the cable.
•
When the cable entry is complete, tighten it with a monkey spanner.
•
At this time, apply enough locking compound (Loctite 263)
to the fastening holes.
Loctite 263
IVEX Series Explosion Proof Camera Manual
SMPS connection in explosion-proof
enclosure
•
After all installation is complete, install the product and enclosed
SMPS inside the explosion-proof enclosure, and install necessary
devices such as network and other RS-485 controllers.
•
Carefully c,- of DC-12V power and apply power.
•
Carefully check all connections to the product before applying power.
•
When the power is applied, if there is no problem,
it is connected to the network and it is in a state that can be
used normally.
•
Immediately after detecting an abnormality in the initial state,
turn off the power and contact the manufacturer.
DC12V
NETWORK
etc.
220V
GND
12V-
12V+
①
It is strongly recommended that all devices be carried out after final testing
prior to installation at the final installation site.
How to Installation