
- Check main and counter spindles
Carrying out the maintenance activities described below requires
special knowledge. For this reason, these maintenance activities
must only be carried out by staff that has received adequate training
by the machine manufacturer!
Orientation
During this maintenance activity, various components in the area of the spindles are
checked for leaks on the one hand and for the general condition of the power and
encoder connections on the other.
Requirement
The following tools and spare parts are required to carry out this maintenance:
1. Sealing rings or O-rings
2. Supply or fluid lines as necessary
Procedure
1.
Example: Hollow clamping cylinder version
1
O-ring
2
Rotary feeder
3
Anti-twist lock
Maintenance Summary - 4.000 Operating hours
106
Maintenance Instructions
G300.2 G320.2 G400.2 G420 G500.2 G520
DIE147EN - 17.08.2022