STEP 11 (See Cable Loop Diagram & Diagram 11)
A.) Attach the 102” Upper Cable (#36) to the front opening on the Upper Frame (#8).
Attach a Pulley (#64) to the opening. Secure it with one M10 x 2 3/8” Allen Bolt
(#96), two Pulley Bushings (#63), and one M10 Aircraft Nut (#106). Draw the Cable
towards the back of the machine. Note: Make sure the Ball Stopper is underneath
the frame.
B.) Attach a Pulley to the opening on the Upper Frame. Secure it with one M10 x 2 3/8”
Allen Bolt (#96), two Pulley Bushings (#63), and one M10 Aircraft Nut (#106).
C.) Draw the Cable around the Pulley and downward. Install a Pulley to the two Double
Floating Pulley Brackets (#32). Secure it with one M10 x 1 ¾” Allen Bolt (#95), two
∅
¾” Washers (#109), and one M10 Aircraft Nut (#106). Let the bracket hanging for
now. Draw the Cable around the Pulley then upward to the open bracket on the
Upper Frame.
D.) Install a Pulley to the bracket with a L-shaped Cable Retainer (#60).
E.) Draw the Cable around the Pulley then downward to the Selector Rod (#53). Attach
the ring on the Selector Pin (#62) to the Selector Rod (#53). Securely thread the
end of the Cable into the Selector Rod. Use the Nut at the end of the Cable to
tighten down the Bolt.
19
Summary of Contents for IRON GRIP STRENGTH TSA-9900
Page 5: ...HARDWARE PACK 4 ...
Page 6: ...HARDWARE PACK 5 ...
Page 7: ...HARDWARE PACK 6 ...
Page 14: ...DIAGRAM 6 13 ...
Page 19: ...CABLE LOOP DIAGRAM 18 ...
Page 21: ...DIAGRAM 11 20 ...
Page 24: ...DIAGRAM 13 23 ...
Page 27: ...DIAGRAM 15 26 ...