STEP 14 (See Diagram 14)
A.) Attach the 49” Front Press Cable (#38) to the small opening on the Right Vertical Frame
(#5). Secure the head of the Cable to the small opening with one M10 x 2 3/8” Allen Bolt
(#96), two Ø3/4” Washers (#109), and one M10 Aircraft Nut (#106).
B.) Draw the Cable to the open bracket on the Front Press Base (#29). Install a Small Pulley
(#65) to the bracket.
C.) Draw the Cable around the Small Pulley then back to the opening on the Right Vertical
Frame (#5) then to the open bracket on the Right Base Frame (#1). Install a Pulley to
the bracket with a L-shaped Cable Retainer (#60).
D.) Draw the Cable around the Pulley then upward to the Angled Floating Pulley Bracket
(#31) previously installed in Step-13.
E.) Secure the end of Cable to the Bracket with one M10 x 1” Allen Bolt (#94), two Ø ¾”
Washers (#109), and one M10 Aircraft Nut (#106).
DIAGRAM 14
24
Summary of Contents for IRON GRIP STRENGTH TSA-9900
Page 5: ...HARDWARE PACK 4 ...
Page 6: ...HARDWARE PACK 5 ...
Page 7: ...HARDWARE PACK 6 ...
Page 14: ...DIAGRAM 6 13 ...
Page 19: ...CABLE LOOP DIAGRAM 18 ...
Page 21: ...DIAGRAM 11 20 ...
Page 24: ...DIAGRAM 13 23 ...
Page 27: ...DIAGRAM 15 26 ...