background image

C33

C33

C33

C33

7

4

6

5

1

2

3

1

2

3

4

5

6

7

11 - IE

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

Fig. 1-18

Fig. 1-20

Fig. 1-19

The kit includes:

N° 1 -  Gasket (1)

N° 1 -  Female concentric flange (2)

N° 1 -  Wall sealing plate (3)

N° 1 -  Aluminium tile (4)

N° 1 -  Int./exhaust concentric pipe 

Ø60/100 (5)

N° 1 -  Fixed half-shell (6)

N° 1 -  Mobile half-shell (7)

The adapter Kit includes:

 N° 1 -  Gasket (1)

 N° 1 -  Adapter  

Ø80/125 (2)

The Kit Ø80/125 includes:

N° 1 -  Wall sealing plate (3)

N° 1 -  Aluminium tile (4)

N° 1 -  Fixed half-shell (5)

N° 1 -  Mobile half-shell (6)

N° 1 -  Int./exhaust concentric 

pipe Ø80/125 (7)

The remaining components of the 

kit are not to be used

1.11 VERTICAL CONCENTRIC KIT 

INSTALLATION.

Type C configuration, sealed chamber and 

fan assisted.

Vertical concentric of intake and exhaust kit. 

This terminal enables the air intake and the flue 

exhausts to be directly emitted outside the house 

in a vertical direction.

N.B.:

  the  vertical  kit  with  aluminium  tile 

enables installation on terraces and roofs with 

a maximum slope of 45% (approximately 25°) 

and the height between the terminal cap and 

half-shell (374 mm for Ø60/100 and 260 mm for 

Ø80/125) must always be respected.

Vertical kit with aluminium tile Ø60/100. 

Kit assembly (Fig. 1-17): install the concentric 

flange  (2)  on  the  central  hole  of  the  boiler, 

positioning  the  gasket  (1) 

(which  does  not 

require lubrication)

  with the circular projections 

downwards in contact with the boiler flange and 

tighten using the screws present in the kit.

Imitation aluminium tile installation: replace the 

tile with the aluminium sheet (4), shaping it to 

ensure that rainwater runs off. Position the fixed 

half-shell (6) and insert the intake-exhaust pipe 

(5). Fit the Ø60/100 (3) concentric terminal pipe 

with the male end (5) (smooth) into the flange (2) 

up to the stop; making sure that the wall sealing 

plate has been fitted (3), this will ensure sealing 

and joining of the elements making up the kit.
• Extensions for vertical kit Ø60/100 (Fig. 1-18). 

The  vertical  kit  with  this  configuration 

can be extended to 

a max. straight vertical 

length of 14.4 m

 including the terminal. This 

configuration corresponds to a resistance factor 

of 100. In this case the special extensions must 

be requested.

Vertical kit with aluminium tile Ø80/125.

Kit assembly (Fig. 1-19): for the installation of kit 

Ø80/125 the flanged adapter kit must be used to 

be able to install the flue system Ø80/125. Install 

the flanged adapter (2) on the central hole of the 

boiler, positioning the gasket (1) 

(which does not 

require lubrication)

 with the circular projections 

downwards in contact with the boiler flange 

and tighten using the screws preset in the kit. 

Imitation aluminium tile installation: replace 

the tile with the aluminium sheet (4), shaping 

it to ensure that rainwater runs off. Position 

the fixed half-shell (5) on the aluminium tile 

and insert the intake-exhaust pipe (7). Fit the 

Ø80/125 concentric terminal pipe with the male 

end (smooth) to the female end of the adapter 

(1) (with lip gasket) up to the stop; making sure 

that the wall sealing plate has been fitted (3), this 

will ensure sealing and joining of the elements 

making up the kit.
• Extensions for vertical kit Ø80/125 (Fig. 1-20). 

The vertical kit with this configuration can be 

extended to a 

max. length of 32 m

 including 

the terminal. If additional components are 

assembled,  the  length  equivalent  to  the 

maximum allowed must be subtracted. In this 

case specific extensions must be requested.

Fig. 1-17

M

A

X.

 L

EN

G

TH

 1

44

00

 M

M

M

A

X.

 L

EN

G

TH

 3

20

00

 M

M

Summary of Contents for VICTRIX Superior TOP 32 E

Page 1: ...VICTRIX Superior TOP 32 E IE Instruction and warning book 1 032471IE...

Page 2: ...DECLARES THAT the Immergas boiler model Victrix Superior TOP 32 E is in compliance with the same European Community Directives Mauro Guareschi Research Development Director Signature Dear Client Our c...

Page 3: ...r any damage caused to the household appliances It is also advisable to not position furnishings furniture etc under the boiler for the above mentioned reasons In the event of malfunctions faults or i...

Page 4: ...The instructions of the manufacturer of this liquid must be followed scrupulously regarding the percentage necessary with respect to the minimum temperature at which the system must be kept An aqueous...

Page 5: ...lime scale apparatus is preserved for example limescale deposits from the slurry formation and other noxious deposits Waterconnectionsmustbemadeinarationalway using the couplings on the boiler templa...

Page 6: ...the Super CAR must be used with its climate thermostat function disabled i e it must be set to On Off mode CARV2 Super CAR or On Off chrono thermostat electrical connection Optional The operations des...

Page 7: ...This information allows calculations to be made to verify the possibility of setting up various flue configurations Positioning of the gaskets black for green range flue extraction systems Position t...

Page 8: ...Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric vertical intake exhaust terminal 60 100 Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust...

Page 9: ...laps Fit the male side smooth of the exhaust terminal into the the female side of the bend 90 80 making sure that the relevant wall sealing plate is already fitted this will ensure the hold and joinin...

Page 10: ...ested Horizontal intake exhaust kit 80 125 Kit assembly Fig 1 15 for the installation of kit 80 125 the flanged adapter kit must be used to be able to install the flue system 80 125 Install the flange...

Page 11: ...take exhaust pipe 5 Fit the 60 100 3 concentric terminal pipe with the male end 5 smooth into the flange 2 up to the stop making sure that the wall sealing plate has been fitted 3 this will ensure sea...

Page 12: ...flat flange present in the lateral hole with respect to the central one according to needs and replace it with the flange 3 positioning the gasket 2 already present in the boiler and tighten using th...

Page 13: ...he removal of possible condensate forming in the exhaust pipe tilt the pipes towards the boiler with a min slope of 1 5 Assemble the lid A complete with adapter 1 and wall plugs 6 and assemble the flu...

Page 14: ...ue technical slot The max possible length of the 60 flexible ducting vertical section is equal to 30 m This length is obtained considering the complete 80 exhaust terminal 1m of 80 pipe in exhaust two...

Page 15: ...ent the circulation pump by loosening the front cap and keeping the motor running Re tighten the cap after the operation 1 19 FILLING THE CONDENSATE TRAP On first lighting of the boiler combustion pro...

Page 16: ...the power supplied by the burner greater the power greater the speed Moreover inside the parameter it is possible to regulate the operation range of the pump by setting the maximum speed adjustable fr...

Page 17: ...ly This kit is very useful for maintenance because it allows to empty just the boiler without having to empty the entire system Moreover the version with filter preserves the functioning characteristi...

Page 18: ...e of electrical power requires some fundamental rules to be observed do not touch the appliance with wet or moist parts of the body do not touch when barefoot never pull electrical cables or leave the...

Page 19: ...tral heating in order to evacuate residual flue gases F5 Postcirculation in progress Pump in function after a request for domestic hot water or central heating in order to cool the primary circuit P33...

Page 20: ...By turning the selector switch 1 in a clockwise direction the temperature increases and in an anti clockwise direction it decreases During the heating of the domestic hot water DHW ON appears on the...

Page 21: ...chnician must be called e g Immergas After Sales Service Maximum No of resets Available number of resets already made Insufficient system pressure Water pressure inside the central heating system that...

Page 22: ...in the case of malfunctioning or anomaly the display of the temperature is replaced by the relative error code present in the table Par 2 6 2 7 BOILER SHUTDOWN Switchtheboileroffbypressingthe button d...

Page 23: ...The display is always lit up OFF The display only lights up when the controls are accessed and remains on for 5 seconds after the last operation performed P32 D C P32 B D C ITALIANO D x select C All d...

Page 24: ...t by the external probe See OFFSET on the external probe graphics Fig 1 8 by modifying the temperature from 15 C to 15 C P94 D x select C It defines the flow temperature of the zone number 3 at low te...

Page 25: ...or aeration of the installation room where provided If even only a single safety check offers a negative result do not commission the system 3 1 HYDRAULIC DIAGRAM Key 1 Condensate drain trap 2 Water i...

Page 26: ...the system pressure is within established limits Check that the radiator valves are not closed and also the functionality of the pump Siphon blocked This may be caused by dirt or combustion products...

Page 27: ...board air gas circuit components or in the case of installations with fume extraction systems with horizontal concentric pipe measuring more than 1 metre The boiler heat output is correlated to the le...

Page 28: ...ive take the heating selector switch to maximum turn it in a clockwise direction until 99 is seen on the display To have an exact value of CO2 in the flue gases the technician must insert the sampling...

Page 29: ...the maximum delivery temperature With the external probe present it defines the maximum flow temperature corresponding to functioning with minimum external temperature see graphics Fig 1 8 can be set...

Page 30: ...juster on the various levels Auto automatic functioning therefore with variable flow rate Open adjuster completely open therefore maximum flow rate available 08 L M 10 L M and 12 L M ffunctioning with...

Page 31: ...t upstream from the boiler Set the P 71 function on P 71 1 Par 3 8 When the boiler inlet water is at a temperature that is equal or greater with respect to that set by the domestic hot water selector...

Page 32: ...with that indicated by the regulations in force 3 17 CASING REMOVAL To facilitate boiler maintenance the casing can be completely removed as follows disassemble the front 1 of the boiler by loosening...

Page 33: ...kg h mbar mm H2 O kg h mbar mm H2 O 32 0 27520 3 45 8 30 84 6 2 58 8 40 85 7 2 53 8 20 83 6 31 0 26660 3 34 7 80 79 6 2 49 7 88 80 4 2 45 7 76 79 2 30 0 25800 3 23 7 33 74 7 2 41 7 39 75 3 2 37 7 34...

Page 34: ...ith burner On Off 80 60 C 0 48 0 30 Heat loss at flue with burner On Off 80 60 C 0 03 2 20 Central heating circuit max operating pressure bar 3 Central heating circuit max operating temperature C 90 A...

Page 35: ......

Page 36: ...immergas com Immergas S p A 42041 Brescello RE Italy T 39 0522 689011 F 39 0522 680617 This instruction booklet is made of ecological paper Code 1 032471IE rev 15 036945 001 09 2012...

Reviews: