![Imagine Selenio 6800 HUC6801+D Installation And Operation Manual Download Page 20](http://html1.mh-extra.com/html/imagine/selenio-6800-huc6801-d/selenio-6800-huc6801-d_installation-and-operation-manual_2045396020.webp)
Chapter 2
Installation
8
Copyright © 2010, Harris Corporation
Unpacking the Module
Preparing
the Product
for
Installation
Before you install the HUC6801
+
D, perform the following:
Check the equipment for any visible damage that may have occurred during transit.
Confirm receipt of all items on the packing list. See
below
for more information.
Contact your Customer Service representative if parts are missing or damaged.
Remove the anti-static shipping pouch, if present, and all other packaging material.
Retain the original packaging materials for possible re-use.
See
Unpacking/Shipping Information
on page viii for information about returning a
product for servicing.
Checking the
Packing List
Setting
Jumpers
The HUC6801
+
D module has one standard jumper
(REM/LOC)
for remote or local control,
and one jumper
(J1)
for genlock termination.
Figure 2-1
HUC6801
+
D jumpers
Table 2-2
Available Product Packages
Ordered Product
Content Description
HUC6801
+
D module
One front module
One back module
One HUC6801
+
D Broadcast
Upconverter
Installation and Operation Manual
REM/LOC
(remote/local) jumper
Jumper J1
genlock termination
Summary of Contents for Selenio 6800 HUC6801+D
Page 3: ...Edition A August 2010 HUC6801 D Broadcast Upconverter Installation and Operation Manual...
Page 4: ......
Page 8: ...Contents vi Copyright 2010 Harris Corporation...
Page 18: ...Chapter 1 Introduction 6 Copyright 2010 Harris Corporation...
Page 56: ...Chapter 5 Specifications 44 Copyright 2010 Harris Corporation...