![background image](http://html.mh-extra.com/html/image/6-5/6-5_manual_2044958014.webp)
14
27. Remove both 3 1/2” Pulleys (24) from the pre-assem-
bled Pulley Frame (22).
Wrap the Weight Cable (72) around a 3 1/2” Pulley
(24) in the direction shown. Attach the 3 1/2” Pulley to
the Pulley Frame (22) with a 3/8” x 1 3/4” Bolt (57)
and a 3/8” Nylon Locknut (50).
Make sure that the
Pulley Frame is turned as shown.
26. Place the Weight Cable (72) in the groove of a
3 1/2” Pulley (24) and push the Pulley up into the
welded bracket on the Weight Upright (9). Attach the
3 1/2” Pulley inside the welded bracket on the Weight
Upright (9) with a 3/8” x 1 3/4” Bolt (57) and a
3/8” Nylon Locknut (50).
26
50
9
50
24
57
22
72
57
24
72
Welded
Bracket
27
28. Attach the closed loop on the Weight Cable (72)
inside the indicated slot in the Weight Upright (9) with
a 3/8” x 2 3/4” Bolt (46), two 3/8” Flat Washers (48),
and a 3/8” Nylon Locknut (50).
48
46
72
50
48
9
28
Slot