Ilumen
12
Installation Manual Ilumen PID Box & Ilumen PID Control Box
11)
Turn the DC switch from the inverter back on followed by the AC side of the PV plant.
12)
Register on my.ilumen.be.
You must mail the installations geographic location to
with the Ilumen PID Control Box serial number to get your login details and
activation.
The Ilumen PID Control Box may never be moved to another
geographic location before approval of Ilumen.
3
4
10
9
9
8
8
7
7