2x
1x
2x
2x
2x
1x
2x
2x
4x
1x
1x
1x
1x
1x
2x
1x
1x
1x
1x
1x
67542
67549
67576
67566
67603
67550
67574
67564
67561
67544
67538
67545
67537
67702
67571
67548
67920
67919
67606
67546
67541
Blade holder
Hub
Ball
Ball bearing 2x6x3 mm
M2x8 mm LK Screw
Tail rotor shaft
M3x4 mm set screw
Ballend, short
M2x6 mm LK Screw
Tail pitch plate
Collar
Outer slide ring
Slide bush
Pulley
Ball bearing 3x7x3 mm
Housing
Belt
Tailpipe
Vertical fin
Spacer
Pitch lever
Washer 2 mm
M2x14 mm CH Screw
The belt can be passed through the tailboom
easily, when you tighten up temporarily the
belt through the clevis of the tail control snake
(in the cardboard box). After that, pull the tail
control snake through the boom.
Please watch out for the alignment of the
pushrods,while you are assembling.
Use cyano glue to fix the outer slide ring onto
the collar. Avoid spoiling glue to the slide
bush. The collar must move without friction.
counter-
clockwise!
Allow a small gap
between the slide
bush and the
outer slide ring.