Should it stop operating check the water supply is still OK and start again. If the 
pump still does not work the electrical supply will need to be checked.  If the 
electrical supply is found OK, then contact IGS for further assistance. 
 

Actuators: 

 

These actuators are critical for the 
operation of the system.  The actuator on 
the right has a tap below it (behind the 
wiring), which brings air in from the side 
(blue open plug) and has a set screw 
adjustment on the top. 
 
There is no need to adjust the left-hand 
actuator. Take care as this actuator does 
get hot.  You will not need to adjust the 
right-hand actuator, only the air valve. 
 

Cavitation cylinder: 

 

The cavitation cylinder is a critical operational 
component of the product for the creation of 
microbubbles.  It is found at the rear of the unit on 
the left-hand side, under the electrical enclosure. 
 
On the top of this cylinder is a pressure gauge 
which will need to be checked in operation, with 
adjustments made on the air intake actuator. 
 
No other operator input is required for this cylinder. 

 

 
 
 
 
 

 

Summary of Contents for MBG-N5.5

Page 1: ...OPERATION AND MAINTENANCE MANUAL Version 2 April 2019...

Page 2: ...assist in control of unit for bubble generation Suction hose that connects foot valve to inlet Suction Hose that connects foot valve to primer pump Foot valve in cage High pressure delivery hose with...

Page 3: ...uccessfully operate outside in all weathers The product requires mechanical lifting equipment to place into position or shift from one position to another It is feasible to bolt the frame to a specifi...

Page 4: ...for tightness If unit continues to leak then shut down and remove the delivery hose and check for damage to the seal If seal is damaged replace seal and reconnect How to connect to the water source T...

Page 5: ...other end of the larger hose is connected to the fitting found on the lower left side of the unit and inside the unit Feed the hose though the hole provided This connection is in front of the dischar...

Page 6: ...length is required if the unit is relocated this can be achieved using a three phase extension making sure that any connection is kept out of water that may be around the unit Connection is simple and...

Page 7: ...purpose one is to prime the main pump at start up and the other is to prime the main pump during operation as required This process is automated and requires no operator intervention once the switch i...

Page 8: ...and has a set screw adjustment on the top There is no need to adjust the left hand actuator Take care as this actuator does get hot You will not need to adjust the right hand actuator only the air val...

Page 9: ...e to adjust the pressure you need to adjust the air intake actuator Adjusting the air intake actuator The air intake actuator is the right hand side actuator which has the blue open plug injected in t...

Page 10: ...bles will clear once the unit is turned off as they break to nanobubbles and both remain in the water as a bank of air for some considerable time Maintenance The Microbubble Generator is designed to o...

Page 11: ...ure the unit is creating microbubbles at its optimum capacity If it is noticed this tends to change check the lock nut has not worked loose If it has readjust and retighten the lock nut Also check the...

Reviews: