•
Avoid looking directly into the source of light. It
particular for people where epileptic seizure has been diagnosed by a doctor
•
Power cable, never pull the power cable to remove the plug from the receptacle, is sure to
hold the plug. When not using the device
the plug from the receptacle.
•
Make sure that the area under the item is blocked, while mounting it or working on it.
•
When cleaning, use a clean dry cloth to wipe off the dust, or a wet soft cloth for s
A NOTE
After taking the device from a warm to a cold room, it may not be put into operation.
The resulting condensation can possibly destroy the device. Do not turn on the device
until it has reached ambient temperature.
A NOTE
Damages caused by the disregard of this user manual are not subject to warranty.
The dealer will not accept liability for any resulting defects or problems. Make sure the
electrical connection is carried out by qualified personnel. All electrical and mechanical
connections have to be carried out according to the European safety standards.
This device falls under the protection class I. It is necessary to follow the instructions.
1.1.2. Overhead rigging
The suspension devices have to be build and measured so they can
of the payload without suffering a permanent detrimental deformation
made by using a second separate suspension. This can be e.g. a suitable net. The second
suspension must be designed and
failure. The maximum drop distance must never exceed
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
areas, on lightning bridges, under
Before taking the device in operation, the installation must be approved by an expert. The operator
obliged to get an expert to check safety
A NOTE
Overhead installation requires a high level of experience. This includes knowledge of
calculating the payload, used installation material and safety inspections of the used
installation material and the projector whereas the required experi
this. Do not try to carry out installation yourself under any circumstances if you are not
qualified. Contact a professional installer. An inappropriate installation can lead to
injuries and/or damaged properties.
If the projector may hang from the ceiling or from high beams, the use of truss systems is mandatory.
The projector may not be installed so it can swing freely in the room
4 / 16
L E D C O L O R I N V A D E R I I
Avoid looking directly into the source of light. It may cause epileptic seizures. This applies in
particular for people where epileptic seizure has been diagnosed by a doctor
Power cable, never pull the power cable to remove the plug from the receptacle, is sure to
hold the plug. When not using the device for an extended period of time, be sure to disconnect
the plug from the receptacle.
Make sure that the area under the item is blocked, while mounting it or working on it.
When cleaning, use a clean dry cloth to wipe off the dust, or a wet soft cloth for s
After taking the device from a warm to a cold room, it may not be put into operation.
The resulting condensation can possibly destroy the device. Do not turn on the device
until it has reached ambient temperature.
aused by the disregard of this user manual are not subject to warranty.
The dealer will not accept liability for any resulting defects or problems. Make sure the
electrical connection is carried out by qualified personnel. All electrical and mechanical
nnections have to be carried out according to the European safety standards.
This device falls under the protection class I. It is necessary to follow the instructions.
Overhead rigging
suspension devices have to be build and measured so they can withstand for an hour the tenfold
of the payload without suffering a permanent detrimental deformation. Basically installation has to be
made by using a second separate suspension. This can be e.g. a suitable net. The second
suspension must be designed and attached so no part of the installation can fall down in case of
The maximum drop distance must never exceed 20 cm.
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden
Before taking the device in operation, the installation must be approved by an expert. The operator
obliged to get an expert to check safety-related and mechanical facilities at least once
Overhead installation requires a high level of experience. This includes knowledge of
calculating the payload, used installation material and safety inspections of the used
installation material and the projector whereas the required experi
this. Do not try to carry out installation yourself under any circumstances if you are not
qualified. Contact a professional installer. An inappropriate installation can lead to
injuries and/or damaged properties.
ay hang from the ceiling or from high beams, the use of truss systems is mandatory.
The projector may not be installed so it can swing freely in the room.
L E D C O L O R I N V A D E R I I R G B W
may cause epileptic seizures. This applies in
particular for people where epileptic seizure has been diagnosed by a doctor.
Power cable, never pull the power cable to remove the plug from the receptacle, is sure to
for an extended period of time, be sure to disconnect
Make sure that the area under the item is blocked, while mounting it or working on it.
When cleaning, use a clean dry cloth to wipe off the dust, or a wet soft cloth for stubborn dirt.
After taking the device from a warm to a cold room, it may not be put into operation.
The resulting condensation can possibly destroy the device. Do not turn on the device
aused by the disregard of this user manual are not subject to warranty.
The dealer will not accept liability for any resulting defects or problems. Make sure the
electrical connection is carried out by qualified personnel. All electrical and mechanical
nnections have to be carried out according to the European safety standards.
This device falls under the protection class I. It is necessary to follow the instructions.
withstand for an hour the tenfold
Basically installation has to be
made by using a second separate suspension. This can be e.g. a suitable net. The second
attached so no part of the installation can fall down in case of
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
elevated work stations or any other danger zones is forbidden.
Before taking the device in operation, the installation must be approved by an expert. The operator is
related and mechanical facilities at least once a year.
Overhead installation requires a high level of experience. This includes knowledge of
calculating the payload, used installation material and safety inspections of the used
installation material and the projector whereas the required experience is not limited to
this. Do not try to carry out installation yourself under any circumstances if you are not
qualified. Contact a professional installer. An inappropriate installation can lead to
ay hang from the ceiling or from high beams, the use of truss systems is mandatory.