IRS-100-ULT3 Railway Surveillance System
Page 31
3.11 Power-On Procedure
3.11.1 Installation Checklist
WARNING:
Make sure a power supply with the correct input voltage is being fed into
the system. Incorrect voltages applied to the system may cause damage to
the internal electronic components and may also cause injury to the user.
To power on the IRS-100-ULT3, please make sure of the following:
The bottom cover is installed
All peripheral devices (monitors, antenna, serial communications devices etc.)
are connected
The system is securely mounted
The power cables are plugged in
3.11.2 Power-on Procedure
To power-on the IRS-100-ULT3 please follow the steps below:
Step 1:
Connect the power source to the power input connector of the IRS-100-ULT3
(
). The IRS-100-ULT3 accepts 24 V ~ 110 V DC power input.
Figure 3-24: Power Connector
Summary of Contents for IRS-100-ULT3
Page 14: ...IRS 100 ULT3 Railway Surveillance System Page 1 Chapter 1 1 Introduction ...
Page 21: ...IRS 100 ULT3 Railway Surveillance System Page 8 Chapter 2 2 Unpacking ...
Page 25: ...IRS 100 ULT3 Railway Surveillance System Page 12 Chapter 3 3 Installation ...
Page 48: ...IRS 100 ULT3 Railway Surveillance System Page 35 Chapter 4 4 BIOS ...
Page 80: ...IRS 100 ULT3 Railway Surveillance System Page 67 Chapter 5 5 Maintenance ...
Page 84: ...IRS 100 ULT3 Railway Surveillance System Page 71 Chapter 6 6 Interface Connectors ...
Page 94: ...IRS 100 ULT3 Railway Surveillance System Page 81 Appendix A A Regulatory Compliance ...
Page 98: ...IRS 100 ULT3 Railway Surveillance System Page 85 Appendix B B Safety Precautions ...
Page 103: ...IRS 100 ULT3 Railway Surveillance System Page 90 Appendix C C Watchdog Timer ...
Page 106: ...IRS 100 ULT3 Railway Surveillance System Page 93 Appendix D D Hazardous Materials Disclosure ...